Monday, January 23, 2017

Floor and lights

The wall board for the cubby hole in the attic has been replaced, this was torn out when the house suffered a water leak (twice). The Contractors chased the leak and found it was along the north wall of the north dormer at the flashing. 

The floor for the south room on the second floor has been ordered and should be arriving on the 25th. Pergo


Removed the power outlet at the bottom of the basement stairs ceiling. Wired in a LED light. The house was originally wired with a single incandescent bulb outlet. Later that was removed and the outlet placed so a hanging fluorescent light could be installed.