Tuesday, October 28, 2014

End of October


The door leading to the basement is painted and re-installed with a new handle set. The bathroom door has been painted and is currently sitting on saw horses in basement, awaiting new hardware and re-installation tonight. Old and new Closet door, and door to the den are in the basement for trimming and painting.

Living room baseboards on west side of the room and the section between the vestibule and stairs are painted. vestibule door frame is painted. Mouldings stained and ready for trimming and installation.

The Den has been rearranged allowing the recliner which has resided in the kitchen for so long to be moved into the den. 

Placed some Storm windows in place and picked up plastic window insulation for the crank out windows.

With the recliner removed, a little more work and the kitchen will actually be a kitchen again.



Outside door and window still require painting.

No comments:

Post a Comment